Vegetative Variety

Stachys byzantina Little Lamb

Download Plant Culture

Data is gathered from our West Grove, Pa., trials (Zone 6a). Southern growers: expect 1-2 weeks earlier finishing. Northern growers: 1 week slower. Consider summertime scheduling accurate. Dates based on a standard 72 liner size.

Week color desired
URC stick week
Liner transplant week
Early Spring
 
Quart
(1 ppp)
Gallon
(1 ppp)
 
 
 
 
 
 
 
 
Week color desired
URC stick week
Liner transplant week
Spring/Summer
 
Quart
(1 ppp)
Gallon
(1 ppp)
 
 
 
 
 
 
 
 
Week color desired
URC stick week
Liner transplant week
Late-Summer/Fall
 
Quart
(1 ppp)
Gallon
(1 ppp)
 
 
 
 
 
 
 
 
Propagation Guide
Media EC/pH: EC 0.75-0.80 mmhos/pH 5.8-6.2
Temperature: 70-72°F (21-22°C)
Rooting Hormone: 500 ppm IBA
Mist: Low to moderate
Fertilization: 50-75 ppm N starting day 7
Pinching: Pinch once, prior to transplant.
Transplanting: 35-42 days after sticking
Comments: Mist enough to rehydrate cuttings. Do not over-mist beyond Day 2 or 3.
Finishing Guide
Media pH: 5.8-6.2
Temperature: Nights: 56 to 64°F (13 to 18°C) Days: 65 to 76°F (18 to 24°C)
Light: 5,000 to 8,000
Vernalization: No
Watering: Allow media to dry moderately between watering.
Fertilization: Use a balanced fertilizer at a rate of 150 to 175 ppm N.
Pinch After Transplant: Typically not required
Pests and Fungal Diseases: Not particularly sensitive. Use well-drained media.